# $Log: OIOR_PI6RSO_D_0010_MR_05____vvvvv.ROS $ # # Changed filename for final ORFA delivery - 2007/08/15 - L.Kamp # # Revision 1.4 2007/07/06 21:53:57 kwirth # Increased End_time to include duration of last sequence. # # Revision 1.3 2007/07/06 16:53:09 kwirth # Updated preliminary ESB2 OIORs submitted via e-mail on 6 Jul 2007. # # Revision 1.3 2007/07/05 - L.Kamp # Adjusted timing of mode change commands during observation # # Revision 1.2 2007/06/24 16:48:41 kwirth # Updates for EPS run of complete MR ESB2. # # Revision 1.1 2007/06/23 20:15:50 kwirth # Preliminary ESB2 MR05 OIOR submitted via ROFTS/ORFA on 18 Jun 2007. # Original filename: OIOR_PI6RSO_D_0010_MR_05____00016.ROS # # Changed to individual OIOR for MR05, added Ref_date, Start/End_time, changed # times to relative to pointing event - 2007/06/15 - L.Kamp # # Initial ESB2 OIOR for generic linearity observations - 2007/06/11 - L.Kamp # #=======================================================================================# # Filename: OIOR_PI6RSO_D_0010_MR_05____00021.ROS # Type: Orbiter Instrument Operation Request file # # Description: Observations of Moon on approach, to determine MIRO linearity # # Author: Lucas Kamp # # JPL # # Date: 11 Jun 2007 # # (c) ESA/Estec # #=======================================================================================# # RSOC change: Replaced event driven timing by relative timing. The events are in the instrument level ITL. Version: 00001 Ref_date: 01-Jan-2000 # Irrelevant because will be overridden by top-level ITL, but needed for ORFA. # RSOC change: Replaced our standard Ref_date. Start_time: -000_01:30:00 End_time: +000_01:40:00 # RSOC change: Increased End_time to include duration of last sequence. # RSOC change: Correction. # Start_time: 000_00:00:00 # End_time: 000_02:51:00 #=======================================================================================# # Description: "1. | Start of sequence." #=======================================================================================# -000_01:21:00 MIRO OFF AMRF001A # Power On MIRO via OBCP -000_01:19:00 MIRO Engineering AMRF001B # MIRO Patch -000_01:18:00 MIRO Engineering AMRS613A # Software Restart #=======================================================================================# Description: "2. | Warm up instrument, wait 1 hour to stabilize." #=======================================================================================# -000_01:15:00 MIRO Engineering AMRF008A # "MIRO USO ON v06" -000_01:12:00 MIRO Engineering AMRF007A # "MIRO Cal Heat On v04" -000_01:09:00 MIRO Engineering AMRF009A # "MIRO CTS Warm-up v06" #=======================================================================================# Description: "3. | Go to science mode. Start with MM/SMM background checks (LNA off)." #=======================================================================================# -000_00:09:00 MIRO Engineering AMRF011A # CTS/Dual Continuum -000_00:06:00 MIRO CTS_DualCntm AMRF031A # "MM LNA Power Off v04" -000_00:03:00 MIRO CTS_DualCntm AMRF032A # "SMM LNA Power Off v04" #=======================================================================================# Description: "4. | During the actual observations we just remain in CTS/DualC mode." Description: " | Issue a mode change command before/after each slew to ensure that" Description: " | we have a Cal on dark sky, not while crossing a limb." #=======================================================================================# +000_00:17:00 MIRO CTS_DualCntm AMRF011A # CTS/Dual Continuum +000_01:10:00 MIRO CTS_DualCntm AMRF011A # CTS/Dual Continuum #=======================================================================================# # Description: "5. | End of sequence. Disable science, since MR03 follows." #=======================================================================================# +000_01:30:00 MIRO CTS_DualCntm AMRS632A # Disable_Science # ----------------- End of MIRO Pointing Scenario -------------------- #